Skip to content

Tobin Clark Plan Shifts as Burlingame Weighs Chapin Height

November 21, 2026

Ed Stephens
Ed StephensColdwell Banker Realty4 min readNovember 21, 2026

The earlier Housing Element concept for Hillsborough's Tobin Clark site called for 100 units. The revised concept looks quite different. In downtown Burlingame, a proposal at 1430 Chapin Ave would test how tall the Downtown Specific Plan allows buildings to go. For homeowners and buyers, the stakes are new housing in a town with little new multifamily, a possible precedent for downtown height, and daily travel disruption along El Camino Real.

Hillsborough's Tobin Clark Housing Site Gets a Revised Concept

The Tobin Clark site sits on the southern edge of Hillsborough, next to College of San Mateo. The town owns the 50 acres. About 20 acres are set aside for multifamily housing and 30 acres for open space.

The revised concept, which appeared in the October 26 council packet, replaces the earlier 100-unit idea. It now includes:

  • 24 townhomes
  • 12 custom-home lots with possible ADUs
  • 50 affordable apartments plus a manager's unit

The council held study sessions on Monday, October 12, 2026 and Monday, October 26, 2026. The town has budgeted $539,100 for a project management contract that runs through March 24, 2028.

This is still a concept. A specific proposal would need future review and approvals. Even so, the mix matters. Hillsborough is known for large estates, and a plan that combines townhomes, custom lots and affordable apartments would add housing types the town rarely sees. Anyone following the Hillsborough real estate market should watch how the plan evolves, since the 12 custom-home lots would be a different kind of supply from the estate resales that dominate the weekly numbers.

Source: Burlingame-Hillsborough Times

1430 Chapin Ave: A Five-Story Test for Downtown Burlingame

The proposal at 1430 Chapin Ave, in downtown Burlingame, is a five-story commercial building of 87,307 square feet on a 0.70-acre site. Plans call for partially below-grade parking and two public plazas.

The height is the sticking point. The building needs a Downtown Specific Plan height amendment, and that is only one of several approvals. The applicant also needs:

  • Major design review
  • A special permit for height
  • A condominium permit
  • A TDM (transportation demand management) plan
  • A lot merger with a tentative map

The applicant is developUrban, and the owner is JP Morgan Chase Bank, N.A. The application has been filed with the city. Staff recommended continuing the item from Monday, October 26, 2026 to Monday, November 9, 2026.

Why should a homeowner or buyer care? A height amendment is not just about one lot. If downtown Burlingame allows five stories here, other Chapin Avenue sites could point to it later. That bears on the character of the streets around downtown, on foot traffic, and on what office and mixed-use space looks like near the Burlingame condos and neighborhoods that sit within walking distance.

Source: Burlingame-Hillsborough Times

El Camino Real Roadway Renewal and the Hayne Road Storm Drain Repair

Two road projects are under construction and both affect how people move through the area.

Caltrans is rehabilitating State Route 82, El Camino Real, through Burlingame and into adjoining Hillsborough, San Mateo and Millbrae. Caltrans says the work aims to reduce localized flooding and make pedestrian infrastructure ADA accessible. In active zones, left turns are prohibited around the clock. Most of the work happens on weekday daytimes, so commuters and errand runners feel it most Monday through Friday.

In Hillsborough, the town is making an emergency storm drain repair on Hayne Road near 1090 Hayne Road. Traffic there runs through one lane under flagger control. Floribunda Ave near Town Hall is also affected.

For residents and buyers, the practical advice is simple. Plan routes that avoid left turns off El Camino Real in work zones, and allow extra time on weekdays. Anyone touring homes in Hillsborough or Burlingame should build in a cushion, especially near Hayne Road.

Source: Burlingame-Hillsborough Times

What to Watch

The road work will end, but the land-use decisions will shape these places for years. Tobin Clark shows a town with large lots weighing denser housing on its own land. Chapin Avenue shows a downtown deciding how much height it will accept. Both reward close attention from anyone who owns or hopes to buy nearby, because the first decisions often set the pattern for what follows.

Frequently asked questions

What is in the revised Tobin Clark concept?

It includes 24 townhomes, 12 custom-home lots with possible ADUs, and 50 affordable apartments plus a manager's unit. It replaces the earlier 100-unit idea. It is still a concept, so a specific proposal would need future review and approvals.

How much of the Tobin Clark site would be used for housing?

The town owns the 50 acres. About 20 acres are set aside for multifamily housing and 30 acres for open space.

What is proposed at 1430 Chapin Ave?

It is a five-story commercial building of 87,307 square feet on a 0.70-acre site, with partially below-grade parking and two public plazas. The applicant is developUrban and the owner is JP Morgan Chase Bank, N.A.

Why does the Chapin Ave height amendment matter to homeowners and buyers?

A height amendment is not just about one lot. If downtown Burlingame allows five stories here, other Chapin Avenue sites could point to it later, which bears on the character of the streets around downtown.

What approvals does the Chapin Ave project need besides the height amendment?

It needs major design review, a special permit for height, a condominium permit, a TDM plan, and a lot merger with a tentative map.

How should I plan around the road work?

Avoid left turns off El Camino Real in work zones and allow extra time on weekdays, when most work happens. If you are touring homes, build in a cushion, especially near Hayne Road where traffic is down to one lane under flagger control.

Ed Stephens

Ed Stephens

Coldwell Banker Realty · DRE #00462186

Get Ed’s updates by email

By subscribing you agree to receive email updates from Ed Stephens. You can unsubscribe at any time. Privacy Policy

Peninsula Roots & a Builder’s Eye

Since 1974, Ed Stephens has guided buyers, sellers and developers across the Peninsula, from Burlingame and Hillsborough to San Mateo. He looks forward to bringing that experience, and his eye for architecture and design, to your next move. Explore the site, and reach out to Ed with any questions.